
Hyundai Wheel Excavator R130W-3* Factory Service / Repair/ Workshop Manual !



This Hyundai Wheel Excavator R130W-3 Factory Service/Repair/Workshop Manual provides maintenance and repair procedures for the Hyundai Wheel Excavator R130W-3. It offers step-by-step instructions, highly detailed exploded pictures, and diagrams to assist in maintaining, servicing, diagnosing, and repairing the equipment correctly and efficiently. The manual covers all repair procedures and is suitable for both professional mechanics and DIY enthusiasts.
The manual covers the following:
- SECTION 1: GENERAL
- Group 1: Safety Hints
- Group 2: Specifications
- SECTION 2: STRUCTURE AND FUNCTION
- Group 1: Pump Device
- Group 2: Main Control Valve
- Group 3: Swing Device
- Group 4: Travel Motor
- Group 5: RCV Lever
- Group 6: Accelerator Pedal
- Group 7: Brake Pedal(Valve)
- Group 8: Transmission
- Group 9: Power Control Valve
- Group 10: Steering Valve
- Group 11: Axle
- Group 12: Brake Supply Valve
- SECTION 3: HYDRAULIC SYSTEM
- Group 1: Hydraulic Circuit
- Group 2: Main Circuit
- Group 3: Pilot Circuit
- Group 4: Single Operation
- Group 5: Combined Operation
- SECTION 4: ELECTRICAL SYSTEM
- Group 1: Component Location
- Group 2: Electrical Circuit
- Group 3: Electrical Component Specification
- Group 4: Connectors
- SECTION 5: MECHATRONICS SYSTEM
- Group 1: Outline
- Group 2: Mode Selection System
- Group 3: Automatic Deceleration System
- Group 4: Power Boost System
- Group 5: Travel Speed Control System
- Group 6: Automatic Warming Up Function
- Group 7: Engine Overheat Prevention Function
- Group 8: Arm Half Flow System
- Group 9: Anti-Restart System
- Group 10: Self-Diagnostic System
- Group 11: Engine Control System
- Group 12: EPPR (Electro Proportional Pressure Reducing) Valve
- Group 13: Prolix Switch
- Group 14: Monitoring System
- SECTION 6: TROUBLESHOOTING
- Group 1: Before Troubleshooting
- Group 2: Hydraulic and Mechanical System
- Group 3: Electrical System
- Group 4: Mechatronics System
- SECTION 7: MAINTENANCE STANDARD
- Group 1: Operational Performance Test
- Group 2: Major Components
- Group 3: Work Equipment
- SECTION 8: DISASSEMBLY AND ASSEMBLY
- Group 1: Precaution
- Group 2: Tightening Torque
- Group 3: Pump Device
- Group 4: Main Control Valve
- Group 5: Swing Device
- Group 6: Travel Device
- Group 7: RCV Lever
- Group 8: Turning Joint
- Group 9: Steering Valve
- Group 10: Transmission
- Group 11: Front Axle
- Group 12: Rear Axle
- Group 13: Boom, Arm, Bucket, and Dozer Cylinder
- Group 14: Work Equipment
This manual is available in .PDF format and can be accessed on all versions of Windows and Mac. It is in English and requires Adobe Reader and Win to view. There are no shipping costs, and the manual can be accessed instantly upon payment via a secure payment processor. All pages are printable for convenience.