)RUHZRUG %20$* 5 BC 672 RB/EB,BC 772 RB/RS Foreword BOMAG machines are products from the wide product range of BOMAG compaction equip- ment. The vast experience of BOMAG as well as state-of-the-art production and testing meth- ods, such as lifetime tests of all important components and most stringent quality de- mands, ensure highest reliability of your ma- chine. This manual comprises: ● safety regulations ● operating instructions ● maintenance instructions ● trouble shooting Using these instructions will ● help you become acquainted with the ma- chine. ● avoid malfunctions caused by operating er- rors. Compliance with the maintenance instructions will ● increase the reliability of the machine on the waste disposal site, ● prolong the lifetime of the machine, ● reduce repair costs and downtimes. BOMAG does not assume liability for the function of the machine ● if the operation of the machine does not com- ply with the operating instructions, ● if the machine is used for purposes other that the ones mentioned in these instructions (refer to the safety regulations). No warranty claims can be lodged for damage re- sulting from ● operating errors, ● insufficient maintenance and ● the use of wrong fuels and lubricants. Please note! These instructions were written for the operator and the service personnel on the waste disposal site. Always keep this manual close at hand, e.g. in the tool compartment of the machine or in the contain- er provided for this purpose. This operation and maintenance manual is part of the machine. You should only operate the machine after you have been instructed and by observing these in- structions. Please observe strictly the safety regulations. Please observe also the guidelines of the Civil En- gineering Liability Association "Safety Rules for the Operation of Road Rollers and Soil Compac- tors" and the applicable instructions for prevention of accidents. For your own personal safety you should only use genuine BOMAG spare parts. We reserve the right for technical modifica- tions without prior notification. These operating and maintenance instructions are also available in other languages. You can also obtain the spare parts catalogue and the repair instructions from your BOMAG dealer against the serial number of your machine. Information about the correct use of our machines on waste disposal sites are also available from your BOMAG dealer. The above mentioned and following notes do not extent or replace the warranty and liability condi- tions mentioned in the general terms of business of BOMAG. We wish you successful work with your BOMAG machine. BOMAG GmbH & Co. OHG Printed in Germany Copyright by BOMAG
)RUHZRUG %20$* 6 BC 672 RB/EB,BC 772 RB/RS Please fill in . . . . . . . . . . . . . . . . . . . . . . . . . . . . Machine type (Fig. 1) . . . . . . . . . . . . . . . . . . . . . . . . . . . . Serial-number (Fig. 1 and 2) . . . . . . . . . . . . . . . . . . . . . . . . . . . . Engine type (Fig. 3) . . . . . . . . . . . . . . . . . . . . . . . . . . . . Engine number (Fig. 3) L Note Supplement the above data together with the com- missioning protocol. During commissioning our organisation will in- struct you in the operation and maintenance of the machine. Please observe strictly the safety regulations and all notes on risks and dangers! Fig. 1 Fig. 2 Fig. 3
Table of Contents %20$* 7 BC 672 RB/EB,BC 772 RB/RS 7HFKQLFDO’DWD 6DIHW\UHJXODWLRQV ,QGLFDWRUVDQG&RQWUROV 3.1 General notes 28 3.2 Description of indicators and control elements 28 2SHUDWLRQ 4.1 General notes 44 4.2 Tests before taking into operation 44 4.3 Starting the engine 45 4.4 Starting under low temperatures 48 4.5 Starting with jump leads 49 4.6 Driving the machine 49 4.7 Emergency exit 52 4.8 Actuating the emergency stop switch 53 4.9 Operating the dozer blade 53 4.10 Operating the bucket (RS) 54 4.11 Operating the service brake 56 4.12 Operating the parking brake 57 4.13 Starting and adjusting the air conditioning 58 4.14 Air conditioning, switching Reheat – operation on/off 62 4.15 Air conditioning, changing between circulation air/fresh air operation 63 4.16 Air conditioning, heating operation 64 4.17 Shutting the engine down 65 4.18 Parking on a slope 67 4.19 Towing the machine 68 4.20 Transport of the machine 70 0DLQWHQDQFH 5.1 General notes on maintenance 74 5.2 Fuels and lubricants 75 5.3 Table of fuels and lubricants 78 5.4 Running-in instructions 79 5.5 Maintenance chart 80 5.6 Check the engine oil level 82 5.7 Checking the fuel level 82 5.8 Checking the hydraulic oil level 83 5.9 Visual inspection of the machine for damage and leaks 83 5.10 Check the coolant level 84 5.11 Check the oil level in the splitter gear 86 5.12 Checking/emptying the fuel pre-cleaner (water separator) 86 5.13 Lubricating the joints and bearings on the bucket (RS) 87 5.14 Service the air conditioning (summer operation) 88
Table of Contents %20$* 8 BC 672 RB/EB,BC 772 RB/RS 5.15 Check the fastening of the scrapers 91 5.16 Change the engine oil 92 5.17 Changing the engine oil filter 93 5.18 Check the engine mounts 93 5.19 Checking condition of radiator, intercooler and hydraulic oil cooler, clean, cle- aning the engine 94 5.20 Checking the oil level in the planetary gears 96 5.21 Checking the battery, greasing the poles, checking the battery disconnect switch 96 5.22 Checking, filling the central lubrication system 97 5.23 Checking the condition and tension of the generator V-belt, replacing the V- belt 99 5.24 Check condition and tension of refrigerant compressor V-belt, replace the V- belt 101 5.25 Checking the condition and tension of the fan V-belt, replacing the V-belt 102 5.26 Replacing the fresh air and circulation air filters 104 5.27 Checking the anti-freeze concentration 105 5.28 Oil change in planetary gear 106 5.29 Checking, adjusting the valve clearance 107 5.30 Changing the fuel filter cartridge 108 5.31 Changing the fuel prefilter element 109 5.32 Checking the fastening of engine / turbo charger / combustion air hoses 111 5.33 Changing the fuel filter for the cabin heater (diesel) 112 5.34 Checking, cleaning the oil bath air filter for the cabin heater (diesel) 112 5.35 Changing the hydraulic oil fine filter 113 5.36 Changing hydraulic oil and breather filter 114 5.37 Change oil and filter in the splitter gear 116 5.38 Checking the condition of the articulated joint 117 5.39 Changing the injection valve 118 5.40 Check turbo charger compressor outlet, clean if necessary. 118 5.41 Changing the crankcase ventilation valve 119 5.42 Changing the coolant pump 120 5.43 Changing the pressure retaining valve on te injection pump 120 5.44 Changing the coolant, venting the cooling system 121 5.45 Adjust scrapers and edge cutter 122 5.46 Replacing the pad foot caps 123 5.47 Checking the cutting plates, replacing the cutting plates if necessary 126 5.48 Changing the dry air filter cartridge 126 5.49 Retightening bolted connections 128 5.50 Checking the preheating system. Maintenance in case of frost. 129 5.51 Fill the provision tank for the windscreen washer system 130 5.52 Drain off dirty fluids from front and rear frame 131
Table of Contents %20$* 9 BC 672 RB/EB,BC 772 RB/RS 5.53 Conservation 132 7URXEOHVKRRWLQJ 6.1 General notes on trouble shooting 134 6.2 Engine problems 135
Table of Contents %20$* 10 BC 672 RB/EB,BC 772 RB/RS
This comprehensive operation and maintenance manual is designed for DIY repair enthusiasts seeking practical information on the BOMAG Sanitary Landfill Compactor models BC 672 RB, BC 672 EB, BC 772 RB, and BC 772 RS. It provides detailed procedures for effective operation, handling, lubrication, maintenance, checking, and adjustments.
Serial Numbers:
S/N 101 570 53 1005 (EPA)
S/N 101 570 56 1001 (EPA)
Table of Contents:
Technical Data
Safety Regulations
Indicators and Controls
General Notes
Description of Indicators and Control Elements
Operation
General Notes
Pre-operation Tests
Starting the Engine
Starting Under Low Temperatures
Engine Start with Jump Leads
Machine Operation
Emergency Exit Procedures
Activating the Emergency Stop Switch
Operating the Dozer Blade
Operating the Bucket (RS)
Service Brake Operation
Parking Brake Operation
Starting and Adjusting Air Conditioning
Air Conditioning Features and Modes
Engine Shutdown Procedures
Parking on a Slope
Towing the Machine
Machine Transport Guidelines
Maintenance
General Maintenance Guidelines
Fuels and Lubricants
Fuel and Lubricant Specifications
Running-in Instructions
Maintenance Schedule
Engine Oil Level Check
Fuel Level Check
Hydraulic Oil Level Check
Visual Inspection for Damage and Leaks
Coolant Level Check
Oil Level in the Splitter Gear
Cleaning the Fuel Pre-cleaner (Water Separator)
Lubricating Joints and Bearings on the Bucket (RS)
Air Conditioning Service for Summer Operation
Fastening of the Scrapers
Engine Oil Change
Engine Oil Filter Replacement
Engine Mounts Check
Inspection and Cleaning of Radiator, Intercooler, and Hydraulic Oil Cooler
Planetary Gears Oil Level Check
Battery Maintenance and Safety Check
Central Lubrication System Check and Refill
Generator V-belt Condition and Replacement
Refrigerant Compressor V-belt Maintenance
Fan V-belt Inspection and Replacement
Replacement of Fresh Air and Circulation Air Filters
Antifreeze Concentration Check
Planetary Gear Oil Change
Valve Clearance Adjustment
Fuel Filter Cartridge Replacement
Fuel Prefilter Element Replacement
Inspection of Engine, Turbo Charger, and Combustion Air Hoses
Provision Tank Filling for Windscreen Washer System
Drainage of Dirty Fluids from Front and Rear Frame
Conservation Measures
Troubleshooting
General Troubleshooting Guidelines
Engine Problem Diagnostics
Model Specification: BOMAG Sanitary Landfill Compactor (Fast Moving Soil Compactor) BC 672 RB / BC 672 EB / BC 772 RB / BC 772 RS
Language: English
Total Pages: 140
This manual details practical procedures that can help you achieve peak performance, cost-efficient operation, and safer maintenance routines. It features numerous diagrams and step-by-step instructions designed to assist DIY enthusiasts in diagnosing issues and performing repairs with confidence.
With all pages available for printing, you can easily bring the manual into your workshop or garage whenever needed. Save money by handling your own repairs and maintenance with the help of these clearly organized guidelines.
Recently Viewed
5,521,897Happy Clients
2,594,462eManuals
1,120,453Trusted Sellers
15Years in Business
Price:
Actual Price:
BOMAG Sanitary landfill Compactor (Fast Moving Soil compactor) BC 672 RB / BC 672 EB / BC 772 RB / BC 772 RS Operation & MAINTEN